|
Back
to Studios Page
Wallingford
Studio Printmaking/Painting Studio:
2006 Photos
|
(double click on images for larger
view)
|
|
April 9 North |
April 9 South |
April 9 South |
April 9 North
|
Concept for Painting Printmaking Studio
Construction finish - Winter 2004
(double
click on images for larger view)
|

|

|
| 1/24 structural model looking
from North |
1/24 structural model looking from Northwest and above |
2004 Construction Photos
|
(double click on images for larger
view)
|
|

|

|

|
|
|
Aug. 1
- existing garage torn down looking south |
Aug. 2 -
earth from footing dig |
Aug. 2
east |
|
|

|

|

|

|
|
Aug, 2
- dug for footings, N of Studio |
Aug. 2- dug
for footings, looking west |
Aug.2 to east |
Aug. 2 aerial |
|

|

|

|

|
|
Aug. 4 to south
|
Aug. 4 to nw
|
Aug. 4 from sw to ne
|
Aug. 4 aerial
|
|

|

|

|

|
|
Aug. 5 to south
|
Aug. 5
to nw
|
Aug. 5
to east
|
Aug. 5 aerial
|
|
|
|
|
|
Aug. 6
aerial
|
Aug. 6 to nw
|
Aug. 6
to east
|
Aug. 6
high aerial
|
|
Aug. 10 to south |
Aug. 10 to nw |
Aug. 10 to ne |
Aug. 10 aerial |
|